Services ETIS

Optimization of waste water treatment by
microscopic sludge analysis

 

Aerobic degradation test

 

Quick Scan (water) ground / sludge
click here for more information

The Netherlands has a lot of polluted (water) grounds. The limited sludge raise capacity creates the need to more effective dredging (only polluted sludge). The recent research methods take a lot of time and that is way there has been a feasibility study has been done to stipulate whether pollutions, like Zinc, PAK and PCB can be measured with the “Snuffelstok”. It seems that this approach will be used frequently in the future. At this moment further development takes place.

Water costs reduction 

By means of grey water options (HWA/industrial water), water purification (re-use / loose), Pre-engineering, Loosing license aspects and rate negotiations (VE).

dienst2

Training Measuring and Sampling

Measuring and taking samples of (waste) water and the processing of analysis results is an important subject in many branches. The manner of sampling by using different methods is discussed during this course. Furthermore the different analysis methods which are used will be discussed just like the processing of the results. The course is entirely embedded in the current environment legislation.

Training Integral Watermanagement

The last 5 years the development of Industrial Water management has gone very fast. At this moment, water gets the attention that it deserves. Only in the Netherlands the last years there has been researched the water saving options and the watering course for millions of Euros and there have been investments for many millions of Euros.

Company internal environmental care system (BIMZ)iso14001

More and more companies use care systems to improve the quality of the management and to reduce the employee taxes and the environmental taxes. BIMZ is an appliance to structure and to manage the business’ management.

BIMZ can be applied within companies (for example house construction-cooperation’s) to map the environmental significance. This leads to a justified integrated environmental policy for both facility process and the primary process of a company. In practice this generally means a strengthening of the realisation concerning the environment and a strong overall cost reduction.

 Infrastructural Services

Project management

Project managing & coaching on the basis of detaching.

Safety advices

Recommendation concerning concept access systems (electronic) recommendation on Executive Board systems and OBE (organizationally, electronically and architectural) quality manager.

Subsidy Management

Subsidy management consists of selection advise, tender application and project management.

To read the documents on this page, you need the Acrobat Reader, which you can download for free with the link mentioned below.

getacro